Penny HMD19
Posted: Sun Jun 02, 2013 9:39 pm
Hi all,
Harmony has her keel laid ; started building in late May. I live in Ottawa, Canada with construction under shelter at the cottage. I have no access to a garage so the logistics are many. The construction season is limited to late spring, summer and early fall so this is going to be a three year project. I ordered the plans during the dead of winter to study, organize and pre-plan, now the marine ply has been delivered (plus a few sheets extra of each), so has the S3 Silver Tip epoxy. Double checked everything and panel cutting / assembly to start soon. As long as the hull is faired (and hopefully bottom painted by September) I plan to flip next spring and start with the internals. Pictures to follow...
Marc aka blueflood
Harmony has her keel laid ; started building in late May. I live in Ottawa, Canada with construction under shelter at the cottage. I have no access to a garage so the logistics are many. The construction season is limited to late spring, summer and early fall so this is going to be a three year project. I ordered the plans during the dead of winter to study, organize and pre-plan, now the marine ply has been delivered (plus a few sheets extra of each), so has the S3 Silver Tip epoxy. Double checked everything and panel cutting / assembly to start soon. As long as the hull is faired (and hopefully bottom painted by September) I plan to flip next spring and start with the internals. Pictures to follow...
Marc aka blueflood