FS19 in Sherwood, OR

To help other builders, please list the boat you are building in the Thread Subject -- and to conserve space, please limit your posting to one thread per boat.

Please feel free to use the gallery to display multiple images of your progress.
Coach
Active Poster
Active Poster
Posts: 289
Joined: Mon Feb 27, 2017 4:55 pm
Location: Beverly, MA

Re: FS19 in Sherwood, OR

Post by Coach »

Looks great! well done

Scrappy
Frequent Poster
Frequent Poster
Posts: 53
Joined: Mon Apr 20, 2020 11:04 am
Location: Sherwood, OR

Re: FS19 in Sherwood, OR

Post by Scrappy »

Got the spray rails cut to shape and plywood cut for the rub rail but once I started dry fitting them thought it better to start fairing first. Made a first attempt on the starboard bottom panel and would give it a D because I didn’t break anything. Put it on thin just filling the weave but think at that rate it would take forever. Switched to the notched trowel method on the port bottom panel. Let it cure overnight and sanded today. Started with a random orbital sander to knock down the obvious highs and then a couple of passes with my fairing board getting the ridges fair. I used the BBC blend to make the fairing compound. Plan on filling with EZ fair. Waiting on more of the fairing blend to arrive hopefully in the next day or two.

6843

Dan_Smullen
* Bateau Builder *
* Bateau Builder *
Posts: 912
Joined: Tue Aug 13, 2019 3:02 pm
Location: VA

Re: FS19 in Sherwood, OR

Post by Dan_Smullen »

For me, fairing was a humbling experience that started 6 months ago. :lol:
Stay after it though! She’s looking good.

Adding spray rails and rub rails is a good way to break up the monotony, and they give you some hard points to work to.

Jeff
Site Admin
Site Admin
Posts: 8446
Joined: Fri Apr 29, 2016 12:17 pm
Location: Vero Beach

Re: FS19 in Sherwood, OR

Post by Jeff »

Great progress Scrappy!!! Congrats, Jeff

Scrappy
Frequent Poster
Frequent Poster
Posts: 53
Joined: Mon Apr 20, 2020 11:04 am
Location: Sherwood, OR

Re: FS19 in Sherwood, OR

Post by Scrappy »

Finally got a coat of fairing compound over the entire hull using the notched trowel method. Continued sanding; my method has been to sand first with the random orbital sander then when I've knocked down the highs and I feel the ridges are close to fair I switch to the fairing board. I work station to station, making 4 passes with the fairing board, first working at a 45 degree angle to the longitudinal axis, then the opposite 45, then two passes, one parallel and one perpendicular to the long axis. There is still a little work to do on the bottom panels near the transom and the side panels at the bow, but the ridges are fair over the majority of the boat.

Next steps are to add the rub rail and spray rails. Then fair in the rails, fill the ridges with fairing compound, sand again, then a final coat with EZ fairing compound.

Started on the spray rails today. I had shaped them from 20' clear cedar 2x2s. The process started out easy enough, I used temporary screws put the spray rail in place, leaving it about 1/2 and inch off the hull, room to apply the Gel Magic. However, after I had applied the glue, because my rails are triangular, but not quite isosceles, and I had started the screws through the outer vertex when I attempted to screw them tight to the hull there was a large gap between the rail and the hull on what will eventually be the top side. Luckily my wife and 12 year old were home and they helped me while I quickly removed and replaced all the screws to get the rail to sit flush against the hull.

6910

6912

6911

6914

6913

6915

GuyP
* Bateau Builder *
* Bateau Builder *
Posts: 496
Joined: Thu Apr 05, 2018 2:01 pm
Location: Atlanta, Ga

Re: FS19 in Sherwood, OR

Post by GuyP »

Looking good. You’ll love getting that first coat of primer on her. All of that fairing blotchiness disappears. I held off with any fairing until my spray rails and strakes were taped in.

Scrappy
Frequent Poster
Frequent Poster
Posts: 53
Joined: Mon Apr 20, 2020 11:04 am
Location: Sherwood, OR

Re: FS19 in Sherwood, OR

Post by Scrappy »

Got the spray rails shaped and glassed to the hull. Got the first layer of the rub rail cut and dry fit. I neglected to cut the rub rail from the side panels before stitching the boat together so this process was a little harder than it needed to be.

6975

6976

6977

6978

6980

6979

User avatar
BB Sig
Very Active Poster
Very Active Poster
Posts: 1750
Joined: Thu Sep 29, 2011 9:20 am
Location: Tallahassee, FL
Contact:

Re: FS19 in Sherwood, OR

Post by BB Sig »

Looking good! I like how you caught the wife getting stuff out of the garage fridge! :lol:

GuyP
* Bateau Builder *
* Bateau Builder *
Posts: 496
Joined: Thu Apr 05, 2018 2:01 pm
Location: Atlanta, Ga

Re: FS19 in Sherwood, OR

Post by GuyP »

Cutting out rub rails before stitching the hull together is an excellent idea. Wish I had heard about that early on also. You’re the first I recall talking about it.

Scrappy
Frequent Poster
Frequent Poster
Posts: 53
Joined: Mon Apr 20, 2020 11:04 am
Location: Sherwood, OR

Re: FS19 in Sherwood, OR

Post by Scrappy »

Making slow and steady progress. Finished putting on the rub rail and then got a second coat of fairing compound over the entire hull. Sanded the port side and transom and they are mostly fair with a few low spots to fill. Started sharpening the edges on the spray rails by building a dam on the top side from plywood strips covered with packing tape and then filling with EZ fillet.

7092

7093

7094

7095

Post Reply

Who is online

Users browsing this forum: No registered users and 14 guests