Ongoing C19 questions...

Power Boats only. Please include the boat type in your question.
fallguy1000
* Bateau Builder - Expert *
* Bateau Builder - Expert *
Posts: 10203
Joined: Tue Jan 12, 2010 12:25 am

Re: Ongoing C19 questions...

Post by fallguy1000 »

I used plywood in two places inthe Skoota build. One of them filled with water and the plywood got wet and shape shifted.

The best way to build the ply boats is to plan for ingress, but attempt to avoid it.

This would be running a bilge pump area and basically sealing it off.

The sole edges and penetrations must all be sealed with 1708 or 1208 tapes. Penetrations must be overbored and epoxied and rebored. The bilge pump lid sealed in butyl or 4200 with pull handles and no sealant on the resting flange or it'll never lift up.

And the plastic under the foam idea is best. The aluminum skiffs here foam with the sole out. That way they can make sure the foam doesn't go into limbers.

Plan for a dry bilge, but accomodate wet and then fix the source of the leak.

Another thing people do is add sightglass or pie eyes. A 2" or 3" piece of pvc that allows you to see into the bilge area. Shine a flashlight and check for water now n then.

I get the tomtom approach. The problem with the approach os that sealing the sole down perfectly onto the compartments is nearly impossible. The glue slides off the cleat tops and you end up with some or quite a few compartments sharing environments. If you are the builder like Tom; you can checkerboard and come out better. But even his build ought to have a few pie eyes at the stern to see if water gets in.

It is an imperfect world, but boats must manage water.

Many, many balsa cored boats had people put screws pr thru hulls in them and when they did; they basically killed the hull.
My boat build is here -------->

viewtopic.php?f=12&t=62495

Dan_Smullen
* Bateau Builder *
* Bateau Builder *
Posts: 912
Joined: Tue Aug 13, 2019 3:02 pm
Location: VA

Re: Ongoing C19 questions...

Post by Dan_Smullen »

New query... Chase tubes.

Mocked up layout in the picture below. Asking for opinions before drilling holes or buying more pipe.

Utilities requiring conduit are
Gas (1" ok?)
Power (wiring harness, main power, and small gauge wiring for aft lights or any aft mounted accessories (2' as mocked up)
Hydraulic steering hose

Do you think I can count on running hydraulic line and all wiring in one conduit?

Does anyone see any problems with the tubes being so far outboard? C/L of 2-1/2" holes are 4-5" in from the end of the frame.

Can hydraulic steering line and fuel share a conduit?

7937

7938

cracked_ribs
Very Active Poster
Very Active Poster
Posts: 511
Joined: Sat Apr 11, 2015 11:58 pm
Location: Western Canada
Location: Ladysmith, BC

Re: Ongoing C19 questions...

Post by cracked_ribs »

This is hardly definitive but personally I don't like the idea of running wiring in the same tube as anything else, and I don't really like the idea of running fuel in the same tube as anything else either.

In particular though, my belief is that wiring should be separated simply because once it's in the tube, you won't see any damage to the jacket via friction unless you pull it out. Nobody regularly removes wiring to inspect it, obviously, so you're just assuming the insulation is intact.

Maybe it's paranoid but I don't like the idea of a wire bundle with a heavier line like a hydraulic hose bouncing around in the same tube, and maybe working its way back and forth a little whenever the steering gets cranked one way or another. If the wires short you might not notice it until you have a real problem. If the weather turned when we were out fishing Constance Bank when I was a kid, my dad used to say "we'd better hot-foot it back in before this gets dangerous" so in some cases hot feet must be desirable but an electrical fire below decks still remains one of my biggest fears.

Just my personal view, though.
I designed my own boat. This is the build thread:

viewtopic.php?f=12&t=65349

Dan_Smullen
* Bateau Builder *
* Bateau Builder *
Posts: 912
Joined: Tue Aug 13, 2019 3:02 pm
Location: VA

Re: Ongoing C19 questions...

Post by Dan_Smullen »

I’m with you. Fuel line will get its dedicated tube.

TomTom
* Bateau Builder *
* Bateau Builder *
Posts: 736
Joined: Thu Nov 22, 2012 10:29 am
Location: East Africa

Re: Ongoing C19 questions...

Post by TomTom »

You could consider sleeves inside a bigger diameter tube as a way to separate every thing.

Fuel should definitely be on its own. I’ve seen some people even run the positive and negative battery cables in separate tubes.

I would be really careful how you fix the pvc pipe to the frames/ through the stringers. I’ve never had a lot of luck with them being properly sealed - though I have been impressed with West Systems G-Flex epoxy on PVC.

Possibly wrap the pvc tube in fiberglass first to stiffen where it goes through the frames. Also bulk up the frame with a small piece of ply either side to make sure you have a bigger gluing area....

fallguy1000
* Bateau Builder - Expert *
* Bateau Builder - Expert *
Posts: 10203
Joined: Tue Jan 12, 2010 12:25 am

Re: Ongoing C19 questions...

Post by fallguy1000 »

I am using black mamba for pvc bonding as per Aripeka Angler.
My boat build is here -------->

viewtopic.php?f=12&t=62495

User avatar
VT_Jeff
* Bateau Builder *
* Bateau Builder *
Posts: 1857
Joined: Fri Oct 25, 2019 6:32 pm
Location: vermont

Re: Ongoing C19 questions...

Post by VT_Jeff »

Heat treating the pvc before using gflex can supposedly improve the bond, we do that when repairing plastic sups and kayaks.
There are only two seasons in Vermont: boating season, and boat-building season.

Completed Paul Butler 14' Clark Fork Drifter
Completed Jacques Mertens FS14LS + 10%, Build Thread
Started Iain Oughtred Tammie Norrie

Dan_Smullen
* Bateau Builder *
* Bateau Builder *
Posts: 912
Joined: Tue Aug 13, 2019 3:02 pm
Location: VA

Re: Ongoing C19 questions...

Post by Dan_Smullen »

fallguy1000 wrote: Sat Nov 28, 2020 9:36 pm I am using black mamba for pvc bonding as per Aripeka Angler.
Like is used for roofing?
VT_Jeff wrote: Sun Nov 29, 2020 9:02 am Heat treating the pvc before using gflex can supposedly improve the bond, we do that when repairing plastic sups and kayaks.
I have some G-flex left over from a kayak repair myself and will experiment with that. Do you suggest using cloth with it, or thickened and used like caulk? I'm thinking for sealing around the pipes where they pass through the frame.

I think I'm going with this layout, mirrored on the other side also.

7969

Both tubes will stop at the last frame. 3rd hole in board of the 2 pipes will be filled. This was cut per plans, but abandoned. 2 others in line with it on forward frames have already been filled using the plugs from the hole saw.

Engine controls through the tube with the 2 sweeps. Hydro steering hose through the one with the white 45.

I'm just about convinced I need to buy hydraulic steering hose now and test fit before closing it up. May also gamble on the prospect of getting a new Suzuki 140 with drive by wire controls. How sexy would that be?

FluidDynamic
* Bateau Builder *
* Bateau Builder *
Posts: 449
Joined: Sun Dec 30, 2018 9:09 pm
Location: Spanish Fort, AL

Re: Ongoing C19 questions...

Post by FluidDynamic »

I think for 2021, the Suzuki 115 and 140 will get drive by wire. Previously you had to get 150 or above. I wish I could get it with a 60 hp. I have digital controls on my Verados and love it. Dont know how I'll be able to go back to cable.
Last edited by FluidDynamic on Sun Nov 29, 2020 7:52 pm, edited 1 time in total.

Dan_Smullen
* Bateau Builder *
* Bateau Builder *
Posts: 912
Joined: Tue Aug 13, 2019 3:02 pm
Location: VA

Re: Ongoing C19 questions...

Post by Dan_Smullen »

FluidDynamic wrote: Sun Nov 29, 2020 7:47 pm I think for 2021, the Suzuki 115 and 140 will get drive by wire. Previously you had to get 150 or above. I wish I could get it with a 60 hp.
I just read that today. I’m salivating.

Post Reply

Who is online

Users browsing this forum: No registered users and 1 guest